Thirty six days the Drill Team stayed on the property for the time it took to drill 1528 meters to find the sandstone bed of the Artesian Basin where the water was. Then the pump was attached and the boiling water gushed out at a rate of 60 liters a second. Pipes transferred the waterContinue reading “Clifton Hills Station Birdsville Track South Australia”